Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | butcherterrace, grassseeds, millenniumbridge, orbital, postclementhorpefloodworks, routeopen, speedhumps, terryavenue, york |
Date time: | 4.11pm, Thursday 15th September, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 15.9.22] Millennium Bridge behind me, looking towards Butcher Terrace, York. [Note: No street view at this location.] Route on the right is open again. Context: #185183. Grass seeds have been applied to the bare earth ahead left. The speed humps collect water. The previous CYC active travel officer said the Environment Agency would be asked to sort the drainage as part of their Clementhorpe Floodworks undertaking. Note the very clear desire line on the right that avoids the humps. Other image here today and links: #186187.
Comments reflect the views of the original submitter only.